Electric Vehicles

Alaska’s FY25 NEVI Plan Approved!

The Alaska Energy Authority (AEA), in collaboration with the Alaska Department of Transportation & Public Facilities (DOT&PF), is pleased to announce that the third annual Alaska National Electric Vehicle Infrastructure (NEVI) Plan was approved by the Federal Highway Administration (FHWA) on November 25, 2024. As a result of this approval, $11 million in additional funding will be available for the continued development of electric vehicle (EV) charging infrastructure across the state. This allocation builds upon the $30 million already designated for fiscal years 2022, 2023, and 2024. The FY25 NEVI Plan outlines strategies to expand EV charging access, ensuring convenient, reliable, and consistent charging experiences for residents and travelers alike. The plan also received renewed approval for discretionary exceptions allowing greater flexibility in site spacing along the Alternative Fuel Corridor between Anchorage and Fairbanks. These exceptions include the routes between Trapper Creek and Cantwell, Wasilla and Trapper Creek, and Healy and Nenana.

Reducing Barriers to Electric Vehicle (EV) Adoption

The transportation sector is increasingly transitioning to electric vehicles (EV). There are now more options for hybrid and full EVs than ever, and with the recent appearance of the electric truck and other all-wheel drive options, Alaskans will see more and more EVs sharing our roadways. EVs and their charging infrastructure can bring new industries to the state, boosting our economy and saving Alaskans money. Much of the country is already transitioning to EVs. However, many Alaskans have identified barriers to adoption such as range anxiety, unknown performance in cold climates, and high prices that prevent them from confidently making an EV their next vehicle purchase. For this reason, AEA has adopted the goal to lead the effort to minimize barriers that inhibit EV adoption in Alaska.
 

Alaska Electric Vehicle Working Group

The Alaska Electric Vehicle Working Group (AKEVWG) meets monthly to discuss EVs and charging infrastructure in Alaska. The Working Group has members from across the state including the Alaska Electric Vehicle Association, the Alaska Department of Transportation and Public Facilities (DOT&PF), electric utilities, EV owners, EV vendors, municipalities, site hosts, universities, and other stakeholders.

Volkswagen Mitigation Trust EV Fast-Charging Network

AEA developed fast-charging stations along the State’s highway system in a phased approach, as funding allows. Using Volkswagen (VW) Trust funds, SEP funds as an added incentive, and matching private funds from participating site hosts, AEA funded a EV Fast-Charging Network connecting the Kenai Peninsula to Healy. A total of 15 fast chargers of at least 50kW and eight co-located Level 2 chargers were installed at nine locations in the following communities: Anchorage, Cantwell, Chugiak, Cooper Landing, Healy, Homer, Seward, Soldotna, and Trapper Creek. Some sites will become operational as early as fall 2021, with all installations completed by summer 2022.

Deployment of Community-based Level 2 Chargers

AEA has used SEP funds to install Level 2 charging stations at state-owned facilities. In partnership with the Department of Transportation & Public Facilities, Level 2 chargers were installed in Anchorage at the Linny Pacillo Parking Garage across from the Robert B. Atwood Building and outside the Snowden Administration Building across from the Nestbett Courthouse in summer 2021.

Cost to Charge an EV at Home

Curious to know how much it would cost to charge an EV at home in Alaska? And what the carbon emissions would be? Use this calculator to find out.

Costs to Host an EV Charging Station

Costs associated with installing a charging station differ depending on location, charger type, and utility rates. To make it easier for potential site hosts to estimate costs, AEA developed a calculator that can be downloaded here.
 

Contact

If you are interested in hosting an EV charging station, please contact us by email at electricvehicles@akenergyauthority.org.

Sign Up for Email Updates

Join our email list to stay up to date with Working Group meetings and receive our newsletters. To subscribe, click here and follow the subscription instructions. You will be sent an email requesting confirmation of your subscription.